QCB November Update

Over the past month, we cut the existing concrete slab to install drains, electrical conduit, and water lines for the brewery, tasting area, restrooms, boiler room, and grain mill room.

Drain pipe to the boiler room with brewery trench drain to the right.

Drain pipe to the boiler room with brewery trench drain to the right.

We placed new electrical conduit in the trenches.

We placed new electrical conduit in the trenches.

We also poured a new concrete pad outside to accommodate our HVAC unit and glycol chiller. These will keep both customers and fermenters at comfortable temperatures.

New HVAC and glycol chiller units.

New HVAC and glycol chiller units.

And once the new floor was poured, we could start framing the new restrooms, utility closet, brewery walls, etc. We have three 40-foot containers of brewery equipment arriving next week, so we are rushing to complete this work as soon as possible.

Framing the restrooms, hall and stairway. The low wall to the right will separate the tasting area from the brewery.

Framing the restrooms, hall and stairway. The low wall to the right will separate the tasting area from the brewery.

Thanks for stopping by!

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s