With the goal of opening this spring, the Queen City Brewery team has spent the last month wrapping up some important parts of our construction project (for more photos, visit our facebook page):

The bar from the old Ethan Allen Club was placed in its final position at the brewery.

The bar from the old Ethan Allen Club was placed in its final position at the brewery.

With the bar in place, we then put our walk-in cooler together. At 13 by 18 feet, it will hold a lot of kegs.

With the bar in place, we then put our walk-in cooler together. At 13 by 18 feet, it will hold a lot of kegs.

The nearly finished exterior of our cooler.

The nearly finished exterior of our cooler.

With most of our tanks in position, we began to assemble the brewhouse piping.

With most of our tanks in position, we began to assemble the brewhouse piping.

The brewhouse is almost put together. We still need to mount the grain hopper above the mash tun and then move the final vessel, the lauter tun, into place.

The brewhouse is almost put together. We still need to mount the grain hopper above the mash tun and then move the final vessel, the lauter tun, into place.

New doors for the boiler room and malt room at the rear of the brewery.

New doors for the boiler room and malt room at the rear of the brewery.

We are getting close to completion of the new 400-amp electrical service. These 250 pound copper coils were pulled into their conduit yesterday. We are ready for the city to hook us up!

We are getting close to completion of the new 400-amp electrical service. These 250 pound copper coils were pulled into their conduit yesterday. We are ready for the city to hook us up!

It really is starting to feel like we are in the home stretch – hopefully, we will brew our first full-size batches by the end of next month.